Pine Grove-Frailey 69kV (S19)

Pine Grove-Frailey 69kV is a 28.0 MW wind interconnection project in Schuylkill, Pennsylvania with a current status of withdrawn.

28.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePine Grove-Frailey 69kV
Queue IDS19
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity28.0 MW
StatePennsylvania
CountySchuylkill
Point of interconnection
Requested (queue) date2007-03-19
Proposed in-service date2009-10-01
Operational date
Withdrawn date2007-11-01
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata