Piney - Timblin 115 kV (AH2-129)

Piney - Timblin 115 kV is a 36.0 MW solar interconnection project in Armstrong, Pennsylvania with a current status of withdrawn.

36.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePiney - Timblin 115 kV
Queue IDAH2-129
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity36.0 MW
StatePennsylvania
CountyArmstrong
Point of interconnection
Requested (queue) date2022-03-01
Proposed in-service date2026-05-29
Operational date
Withdrawn date2026-02-10
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.