Pinnacle Point Energy Storage (26INR0317)

Pinnacle Point Energy Storage is a 101.3 MW other interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at Tap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV.

101.3 MWCapacity
OperationalStatus
HarrisMarket
OtherTechnology

Project facts

Canonical namePinnacle Point Energy Storage
Queue ID26INR0317
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketHarris
TechnologyOther
Capacity101.3 MW
StateTexas
CountyHarris
Point of interconnectionTap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV
Requested (queue) date2023-11-14
Proposed in-service date
Operational date2029-07-10
Withdrawn date
DeveloperGCI Pinnacle Point, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata