PIO PICO CAPACITY INCREASE (FKA PIO PICO ENERGY CENTER 2) (1058)

PIO PICO CAPACITY INCREASE (FKA PIO PICO ENERGY CENTER 2) is a 10.0 MW gas interconnection project in San Diego, California with a current status of operational. It is proposed to connect at Otay Mesa Switchyard 230 kV.

10.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical namePIO PICO CAPACITY INCREASE (FKA PIO PICO ENERGY CENTER 2)
Queue ID1058
Statusoperational
Source statusCOMPLETED
Market
TechnologyGas
Capacity10.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionOtay Mesa Switchyard 230 kV
Requested (queue) date2014-04-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata