PIO PICO UNIT 4 (1185)

PIO PICO UNIT 4 is a 110.0 MW gas interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at Otay Mesa Switchyard 230 kV.

110.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical namePIO PICO UNIT 4
Queue ID1185
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity110.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionOtay Mesa Switchyard 230 kV
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2015-07-08
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata