Pirkey 345 kV Substation (GEN-2024-377)

Pirkey 345 kV Substation is a 1,350.0 MW gas interconnection project in Harrison, Texas with a current status of operational. It is proposed to connect at Pirkey 345 kV Substation.

1,350.0 MWCapacity
OperationalStatus
TXMarket
GasTechnology

Project facts

Canonical namePirkey 345 kV Substation
Queue IDGEN-2024-377
Statusoperational
Source statusDISIS STAGE
MarketTX
TechnologyGas
Capacity1,350.0 MW
StateTexas
CountyHarrison
Point of interconnectionPirkey 345 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date—
Operational date2030-01-05
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.