PITCHFORK ENERGY (1530)

PITCHFORK ENERGY is a 500.0 MW solar+battery interconnection project in Maricopa, Arizona with a current status of withdrawn. It is proposed to connect at Delaney Substation 500kV.

500.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical namePITCHFORK ENERGY
Queue ID1530
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity500.0 MW
StateArizona
CountyMaricopa
Point of interconnectionDelaney Substation 500kV
Requested (queue) date2018-04-16
Proposed in-service date
Operational date
Withdrawn date2019-03-08
Developer
Utility / transmission ownerDCRT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.