DCRT — Interconnection Queue Projects
DCRT is associated with 22 tracked interconnection projects representing 16,177 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
22Projects
6Active
1Operational
15Withdrawn
16,177 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar+Battery | 19 | 15,005 MW |
| Solar | 3 | 1,172 MW |
Portfolio by market
| Market | Projects |
|---|---|
| CAISO | 2 |
Geographic footprint
| State | Projects |
|---|---|
| Arizona | 22 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| ATLAS COMPLEX | 1402 | Solar+Battery | 3,200.0 MW | active | La Paz, Arizona |
| JOVE SOLAR | 2023 | Solar+Battery | 2,000.0 MW | withdrawn | La Paz, Arizona |
| ARIZONA A1 | 1752 | Solar+Battery | 2,000.0 MW | withdrawn | Maricopa, Arizona |
| Stanley | 2331 | Solar+Battery | 1,038.9 MW | active | Maricopa, Arizona |
| BlueWater Solar | 2292 | Solar+Battery | 1,016.4 MW | withdrawn | La Paz, Arizona |
| RANEGRAS PVS | 2025 | Solar+Battery | 700.0 MW | withdrawn | La Paz, Arizona |
| HARQUAHALA SOLAR | 1298 | Solar | 515.1 MW | withdrawn | Maricopa, Arizona |
| CENTENNIAL FLATS | 1529 | Solar+Battery | 500.0 MW | operational | La Paz, Arizona |
| LA PAZ | 1753 | Solar+Battery | 500.0 MW | withdrawn | Maricopa, Arizona |
| ADOBE FLATS | 2026 | Solar+Battery | 500.0 MW | withdrawn | La Paz, Arizona |
| LA PAZ 2 | 2021 | Solar+Battery | 500.0 MW | withdrawn | Maricopa, Arizona |
| PITCHFORK ENERGY | 1530 | Solar+Battery | 500.0 MW | withdrawn | Maricopa, Arizona |
| HARQUAHALA FLATS | 1403 | Solar+Battery | 450.0 MW | withdrawn | Maricopa, Arizona |
| PRIMROSE HYBRID | 2028 | Solar+Battery | 450.0 MW | withdrawn | Maricopa, Arizona |
| HARQUAHALA FLATS 2 | 2027 | Solar+Battery | 400.0 MW | active | Maricopa, Arizona |
| SOCORRO PEAK SOLAR | 2022 | Solar+Battery | 350.0 MW | active | La Paz, Arizona |
| BRENDA RENEWABLE ENERGY COMPLEX | 2024 | Solar | 350.0 MW | withdrawn | La Paz, Arizona |
| CENTURY SOLAR | 1296 | Solar | 306.9 MW | withdrawn | Maricopa, Arizona |
| HARQUAHALA SUNRISE | 1678 | Solar+Battery | 300.0 MW | active | Maricopa, Arizona |
| PAPAGO | 1754 | Solar+Battery | 300.0 MW | withdrawn | Maricopa, Arizona |
| HARQUAHALA SUNRISE 2 | 2029 | Solar+Battery | 150.0 MW | active | Maricopa, Arizona |
| HARQUAHALA SUN | 1404 | Solar+Battery | 150.0 MW | withdrawn | Maricopa, Arizona |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through DCRT.
Start tracking with interXdata