PJM Queue Project AB1-031A — Other in an unlisted county, New Jersey
PJM Queue Project AB1-031A — Other in an unlisted county, New Jersey is a 25.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at LAKEWOOD 18 KV OCEAN C1-ATLANTIC 230 KV REACTR.
25.0 MWCapacity
WithdrawnStatus
PJMMarket
OtherTechnology
Project facts
| Canonical name | PJM Queue Project AB1-031A — Other in an unlisted county, New Jersey |
|---|---|
| Queue ID | AB1-031A |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Other |
| Capacity | 25.0 MW |
| State | New Jersey |
| County | — |
| Point of interconnection | LAKEWOOD 18 KV OCEAN C1-ATLANTIC 230 KV REACTR |
| Requested (queue) date | 2015-07-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2017-03-03 |
| Developer | — |
| Utility / transmission owner | JCPL |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata