PJM Queue Project AF1-048 — Battery in Mchenry, Illinois

PJM Queue Project AF1-048 — Battery in Mchenry, Illinois is a 52.2 MW battery interconnection project in Mchenry, Illinois with a current status of withdrawn. It is proposed to connect at Belvidere-Marengo.

52.2 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AF1-048 — Battery in Mchenry, Illinois
Queue IDAF1-048
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity52.2 MW
StateIllinois
CountyMchenry
Point of interconnectionBelvidere-Marengo
Requested (queue) date2019-06-28
Proposed in-service date2023-12-01
Operational date
Withdrawn date2025-01-22
DeveloperMcHenry County Solar Project, LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata