PJM Queue Project AF1-111 — Solar in an unlisted county, New Jersey

PJM Queue Project AF1-111 — Solar in an unlisted county, New Jersey is a 2.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Kingsland 26 kV.

2.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AF1-111 — Solar in an unlisted county, New Jersey
Queue IDAF1-111
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity2.0 MW
StateNew Jersey
County
Point of interconnectionKingsland 26 kV
Requested (queue) date2019-09-10
Proposed in-service date
Operational date
Withdrawn date2019-09-23
Developer
Utility / transmission ownerPSEG Long Island

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata