PJM Queue Project AF1-252 — Battery in Christian, Illinois

PJM Queue Project AF1-252 — Battery in Christian, Illinois is a 62.4 MW battery interconnection project in Christian, Illinois with a current status of withdrawn. It is proposed to connect at Kincaid-Pana.

62.4 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AF1-252 — Battery in Christian, Illinois
Queue IDAF1-252
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity62.4 MW
StateIllinois
CountyChristian
Point of interconnectionKincaid-Pana
Requested (queue) date2019-09-30
Proposed in-service date2022-09-01
Operational date
Withdrawn date2024-06-24
DeveloperRolling Farms Wind Project, LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.