PJM Queue Project AF1-306 — Battery in Elk, Pennsylvania

PJM Queue Project AF1-306 — Battery in Elk, Pennsylvania is a 197.2 MW battery interconnection project in Elk, Pennsylvania with a current status of withdrawn. It is proposed to connect at Squab Hollow 230 kV.

197.2 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AF1-306 — Battery in Elk, Pennsylvania
Queue IDAF1-306
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity197.2 MW
StatePennsylvania
CountyElk
Point of interconnectionSquab Hollow 230 kV
Requested (queue) date2019-09-30
Proposed in-service date2023-05-31
Operational date
Withdrawn date2024-06-21
DeveloperSeven Creek Energy, LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.