PJM Queue Project AF2-034 — Solar+Battery in Kendall, Illinois

PJM Queue Project AF2-034 — Solar+Battery in Kendall, Illinois is a 20.0 MW solar+battery interconnection project in Kendall, Illinois with a current status of withdrawn. It is proposed to connect at Kendall 345kV.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AF2-034 — Solar+Battery in Kendall, Illinois
Queue IDAF2-034
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar+Battery
Capacity20.0 MW
StateIllinois
CountyKendall
Point of interconnectionKendall 345kV
Requested (queue) date2019-10-28
Proposed in-service date2021-06-01
Operational date
Withdrawn date2025-01-22
DeveloperKendall Solar BESS LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata