PJM Queue Project AF2-183 — Battery in Lee, Illinois

PJM Queue Project AF2-183 — Battery in Lee, Illinois is a 80.0 MW battery interconnection project in Lee, Illinois with a current status of withdrawn. It is proposed to connect at Nelson-Lee County 345 kV.

80.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AF2-183 — Battery in Lee, Illinois
Queue IDAF2-183
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity80.0 MW
StateIllinois
CountyLee
Point of interconnectionNelson-Lee County 345 kV
Requested (queue) date2020-03-20
Proposed in-service date2022-12-01
Operational date
Withdrawn date2024-06-24
DeveloperDeriva Energy
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.