PJM Queue Project AF2-412 — Battery in Tioga, Pennsylvania

PJM Queue Project AF2-412 — Battery in Tioga, Pennsylvania is a 100.0 MW battery interconnection project in Tioga, Pennsylvania with a current status of withdrawn. It is proposed to connect at Mainesburg 115 kV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AF2-412 — Battery in Tioga, Pennsylvania
Queue IDAF2-412
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity100.0 MW
StatePennsylvania
CountyTioga
Point of interconnectionMainesburg 115 kV
Requested (queue) date2020-03-31
Proposed in-service date2022-06-01
Operational date
Withdrawn date2025-01-22
DeveloperElk Run LLC
Utility / transmission ownerPENELEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.