PJM Queue Project AG1-321 — Solar in Livingston, Illinois
PJM Queue Project AG1-321 — Solar in Livingston, Illinois is a 200.0 MW solar interconnection project in Livingston, Illinois with a current status of withdrawn. It is proposed to connect at Dresden-Pontiac Midpoint 345 kV.
200.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | PJM Queue Project AG1-321 — Solar in Livingston, Illinois |
|---|---|
| Queue ID | AG1-321 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Solar |
| Capacity | 200.0 MW |
| State | Illinois |
| County | Livingston |
| Point of interconnection | Dresden-Pontiac Midpoint 345 kV |
| Requested (queue) date | 2020-09-30 |
| Proposed in-service date | 2023-10-01 |
| Operational date | — |
| Withdrawn date | 2024-06-21 |
| Developer | CPV Valley, LLC |
| Utility / transmission owner | ComEd |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata