PJM Queue Project AG1-425 — Battery in Erie, Ohio

PJM Queue Project AG1-425 — Battery in Erie, Ohio is a 20.0 MW battery interconnection project in Erie, Ohio with a current status of withdrawn. It is proposed to connect at Groton 138 kV.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG1-425 — Battery in Erie, Ohio
Queue IDAG1-425
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity20.0 MW
StateOhio
CountyErie
Point of interconnectionGroton 138 kV
Requested (queue) date2020-09-30
Proposed in-service date2023-10-31
Operational date
Withdrawn date2024-06-21
DeveloperWheatsborough Solar, LLC
Utility / transmission ownerATSI

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.