PJM Queue Project AG1-456 — Battery in Highland, Ohio

PJM Queue Project AG1-456 — Battery in Highland, Ohio is a 30.0 MW battery interconnection project in Highland, Ohio with a current status of withdrawn. It is proposed to connect at Wildcat 138 kV.

30.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG1-456 — Battery in Highland, Ohio
Queue IDAG1-456
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity30.0 MW
StateOhio
CountyHighland
Point of interconnectionWildcat 138 kV
Requested (queue) date2020-09-30
Proposed in-service date2022-12-31
Operational date
Withdrawn date2024-06-21
DeveloperWillowbrook Solar I, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.