PJM Queue Project AG2-061 — Battery in Lasalle, Illinois

PJM Queue Project AG2-061 — Battery in Lasalle, Illinois is a 50.0 MW battery interconnection project in Lasalle, Illinois with a current status of active. It is proposed to connect at Powerton-Nevada 345 kV.

50.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-061 — Battery in Lasalle, Illinois
Queue IDAG2-061
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity50.0 MW
StateIllinois
CountyLasalle
Point of interconnectionPowerton-Nevada 345 kV
Requested (queue) date2025-03-14
Proposed in-service date2023-12-31
Operational date
Withdrawn date
DeveloperAurora Solar LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata