PJM Queue Project AG2-084 — Battery in Howard, Indiana

PJM Queue Project AG2-084 — Battery in Howard, Indiana is a 100.0 MW battery interconnection project in Howard, Indiana with a current status of withdrawn. It is proposed to connect at Greentown 138 kV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-084 — Battery in Howard, Indiana
Queue IDAG2-084
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity100.0 MW
StateIndiana
CountyHoward
Point of interconnectionGreentown 138 kV
Requested (queue) date2021-01-22
Proposed in-service date2023-12-31
Operational date
Withdrawn date2025-04-03
DeveloperLocomotive Solar, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata