PJM Queue Project AG2-159 — Solar+Battery in Grant, Kentucky

PJM Queue Project AG2-159 — Solar+Battery in Grant, Kentucky is a 61.0 MW solar+battery interconnection project in Grant, Kentucky with a current status of withdrawn. It is proposed to connect at Williamstown 69 kV.

61.0 MWCapacity
WithdrawnStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-159 — Solar+Battery in Grant, Kentucky
Queue IDAG2-159
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar+Battery
Capacity61.0 MW
StateKentucky
CountyGrant
Point of interconnectionWilliamstown 69 kV
Requested (queue) date2025-03-19
Proposed in-service date2023-09-15
Operational date
Withdrawn date2025-12-03
DeveloperRound Trip, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata