PJM Queue Project AG2-221 — Solar in Bradford, Pennsylvania

PJM Queue Project AG2-221 — Solar in Bradford, Pennsylvania is a 20.0 MW solar interconnection project in Bradford, Pennsylvania with a current status of withdrawn. It is proposed to connect at South Troy - North Towanda 34.5 kV.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AG2-221 — Solar in Bradford, Pennsylvania
Queue IDAG2-221
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyBradford
Point of interconnectionSouth Troy - North Towanda 34.5 kV
Requested (queue) date2025-01-24
Proposed in-service date2024-09-30
Operational date
Withdrawn date2025-11-05
DeveloperFranklin Energy, LLC
Utility / transmission ownerPENELEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.