PJM Queue Project AG2-247 — Solar in Crawford, Pennsylvania

PJM Queue Project AG2-247 — Solar in Crawford, Pennsylvania is a 20.0 MW solar interconnection project in Crawford, Pennsylvania with a current status of withdrawn. It is proposed to connect at Northwestern REC Dixonburg-Vernon 34.5 kV.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AG2-247 — Solar in Crawford, Pennsylvania
Queue IDAG2-247
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyCrawford
Point of interconnectionNorthwestern REC Dixonburg-Vernon 34.5 kV
Requested (queue) date2021-03-17
Proposed in-service date2023-01-15
Operational date
Withdrawn date2025-02-06
DeveloperCassidy Solar LLC
Utility / transmission ownerPENELEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata