PJM Queue Project AG2-314 — Battery in Nicholas, West Virginia

PJM Queue Project AG2-314 — Battery in Nicholas, West Virginia is a 67.0 MW battery interconnection project in Nicholas, West Virginia with a current status of withdrawn. It is proposed to connect at Gilboa-Jones Branch 138 kV III.

67.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-314 — Battery in Nicholas, West Virginia
Queue IDAG2-314
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity67.0 MW
StateWest Virginia
CountyNicholas
Point of interconnectionGilboa-Jones Branch 138 kV III
Requested (queue) date2021-03-25
Proposed in-service date2024-05-01
Operational date
Withdrawn date2024-11-27
DeveloperDeep Lake Energy Center, LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata