PJM Queue Project AG2-329 — Battery in Wyandot, Ohio

PJM Queue Project AG2-329 — Battery in Wyandot, Ohio is a 200.0 MW battery interconnection project in Wyandot, Ohio with a current status of active. It is proposed to connect at S Berwick - Galion 345 kV.

200.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-329 — Battery in Wyandot, Ohio
Queue IDAG2-329
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity200.0 MW
StateOhio
CountyWyandot
Point of interconnectionS Berwick - Galion 345 kV
Requested (queue) date2025-03-04
Proposed in-service date2024-12-02
Operational date
Withdrawn date
DeveloperWombat Solar LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata