PJM Queue Project AG2-344 — Battery in an unlisted county, Indiana

PJM Queue Project AG2-344 — Battery in an unlisted county, Indiana is a 100.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Dequine 345 bkV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-344 — Battery in an unlisted county, Indiana
Queue IDAG2-344
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity100.0 MW
StateIndiana
County
Point of interconnectionDequine 345 bkV
Requested (queue) date2025-03-04
Proposed in-service date2024-12-02
Operational date
Withdrawn date2025-12-02
DeveloperRainbow Trout Solar LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata