Project facts

Canonical namePJM Queue Project AG2-357 — Battery in Will, Illinois
Queue IDAG2-357
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity250.0 MW
StateIllinois
CountyWill
Point of interconnectionWilton 345 kV
Requested (queue) date2021-03-26
Proposed in-service date2024-11-15
Operational date
Withdrawn date2025-07-03
DeveloperBluegill Energy Storage LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata