PJM Queue Project AG2-424 — Solar+Battery in Larue, Kentucky

PJM Queue Project AG2-424 — Solar+Battery in Larue, Kentucky is a 63.2 MW solar+battery interconnection project in Larue, Kentucky with a current status of active. It is proposed to connect at Summersville - Magnolia 69 kV.

63.2 MWCapacity
ActiveStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-424 — Solar+Battery in Larue, Kentucky
Queue IDAG2-424
Statusactive
Source statusactive
MarketPJM
TechnologySolar+Battery
Capacity63.2 MW
StateKentucky
CountyLarue
Point of interconnectionSummersville - Magnolia 69 kV
Requested (queue) date2025-03-14
Proposed in-service date2023-05-31
Operational date
Withdrawn date
DeveloperMagnolia Solar and Grazing Farm LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata