PJM Queue Project AG2-462 — Solar+Battery in Wythe, Virginia

PJM Queue Project AG2-462 — Solar+Battery in Wythe, Virginia is a 150.0 MW solar+battery interconnection project in Wythe, Virginia with a current status of withdrawn. It is proposed to connect at Progress Park - Glen Lyn 138 kV.

150.0 MWCapacity
WithdrawnStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-462 — Solar+Battery in Wythe, Virginia
Queue IDAG2-462
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar+Battery
Capacity150.0 MW
StateVirginia
CountyWythe
Point of interconnectionProgress Park - Glen Lyn 138 kV
Requested (queue) date2021-03-30
Proposed in-service date2024-10-31
Operational date
Withdrawn date2025-06-09
DeveloperMay Solar LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata