PJM Queue Project AG2-467 — Solar in Logan, Illinois

PJM Queue Project AG2-467 — Solar in Logan, Illinois is a 115.0 MW solar interconnection project in Logan, Illinois with a current status of withdrawn. It is proposed to connect at Beason 345 kV.

115.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AG2-467 — Solar in Logan, Illinois
Queue IDAG2-467
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity115.0 MW
StateIllinois
CountyLogan
Point of interconnectionBeason 345 kV
Requested (queue) date2021-03-31
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-07-03
DeveloperInvenergy
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata