PJM Queue Project AG2-535 — Battery in Warren, New Jersey
PJM Queue Project AG2-535 — Battery in Warren, New Jersey is a 20.0 MW battery interconnection project in Warren, New Jersey with a current status of withdrawn. It is proposed to connect at Hackettstown-Pohatcong J738-1 34.5 kV II.
20.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology
Project facts
| Canonical name | PJM Queue Project AG2-535 — Battery in Warren, New Jersey |
|---|---|
| Queue ID | AG2-535 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Battery |
| Capacity | 20.0 MW |
| State | New Jersey |
| County | Warren |
| Point of interconnection | Hackettstown-Pohatcong J738-1 34.5 kV II |
| Requested (queue) date | 2025-03-04 |
| Proposed in-service date | 2022-08-31 |
| Operational date | — |
| Withdrawn date | 2025-12-04 |
| Developer | Mansfield 3 LLC |
| Utility / transmission owner | JCPL |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata