PJM Queue Project AG2-553 — Battery in Bullitt, Kentucky

PJM Queue Project AG2-553 — Battery in Bullitt, Kentucky is a 50.0 MW battery interconnection project in Bullitt, Kentucky with a current status of withdrawn. It is proposed to connect at Bullitt County 161 kV.

50.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AG2-553 — Battery in Bullitt, Kentucky
Queue IDAG2-553
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity50.0 MW
StateKentucky
CountyBullitt
Point of interconnectionBullitt County 161 kV
Requested (queue) date2025-03-13
Proposed in-service date2024-09-01
Operational date
Withdrawn date2025-12-02
DeveloperEDP Renewables North America LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.