PJM Queue Project AG2-562 — Gas in St. Joseph, Indiana

PJM Queue Project AG2-562 — Gas in St. Joseph, Indiana is a 52.0 MW gas interconnection project in St. Joseph, Indiana with a current status of active. It is proposed to connect at Elderberry 345 kV.

52.0 MWCapacity
ActiveStatus
PJMMarket
GasTechnology

Project facts

Canonical namePJM Queue Project AG2-562 — Gas in St. Joseph, Indiana
Queue IDAG2-562
Statusactive
Source statusactive
MarketPJM
TechnologyGas
Capacity52.0 MW
StateIndiana
CountySt. Joseph
Point of interconnectionElderberry 345 kV
Requested (queue) date2025-05-13
Proposed in-service date2022-10-31
Operational date
Withdrawn date
DeveloperSt. Joseph Energy Center, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.