PJM Queue Project AG2-582 — Gas in Doddridge, West Virginia

PJM Queue Project AG2-582 — Gas in Doddridge, West Virginia is a 2,100.0 MW gas interconnection project in Doddridge, West Virginia with a current status of active. It is proposed to connect at Flint Run 500 kV.

2,100.0 MWCapacity
ActiveStatus
PJMMarket
GasTechnology

Project facts

Canonical namePJM Queue Project AG2-582 — Gas in Doddridge, West Virginia
Queue IDAG2-582
Statusactive
Source statusactive
MarketPJM
TechnologyGas
Capacity2,100.0 MW
StateWest Virginia
CountyDoddridge
Point of interconnectionFlint Run 500 kV
Requested (queue) date2025-02-25
Proposed in-service date2026-07-01
Operational date
Withdrawn date
DeveloperCPV Valley, LLC
Utility / transmission ownerAPS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.