PJM Queue Project AG2-625 — Solar in Warren, New Jersey
PJM Queue Project AG2-625 — Solar in Warren, New Jersey is a 19.6 MW solar interconnection project in Warren, New Jersey with a current status of active. It is proposed to connect at Pequest River-Furnace Brook Tap 34.5 kV II.
19.6 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | PJM Queue Project AG2-625 — Solar in Warren, New Jersey |
|---|---|
| Queue ID | AG2-625 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Solar |
| Capacity | 19.6 MW |
| State | New Jersey |
| County | Warren |
| Point of interconnection | Pequest River-Furnace Brook Tap 34.5 kV II |
| Requested (queue) date | 2025-02-12 |
| Proposed in-service date | 2021-04-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Chamberlain East Solar Farm LLC |
| Utility / transmission owner | JCPL |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata