PJM Queue Project AG2-668 — Solar in Clearfield, Pennsylvania

PJM Queue Project AG2-668 — Solar in Clearfield, Pennsylvania is a 20.0 MW solar interconnection project in Clearfield, Pennsylvania with a current status of withdrawn. It is proposed to connect at Harvey Run 34.5 kV.

20.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AG2-668 — Solar in Clearfield, Pennsylvania
Queue IDAG2-668
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity20.0 MW
StatePennsylvania
CountyClearfield
Point of interconnectionHarvey Run 34.5 kV
Requested (queue) date2021-03-31
Proposed in-service date2023-11-01
Operational date
Withdrawn date2025-04-22
DeveloperDu Bois PV I, LLC
Utility / transmission ownerPENELEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata