PJM Queue Project AH1-047 — Solar in Boone, Illinois

PJM Queue Project AH1-047 — Solar in Boone, Illinois is a 58.6 MW solar interconnection project in Boone, Illinois with a current status of withdrawn. It is proposed to connect at Marengo - Belvidere 138 kV.

58.6 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AH1-047 — Solar in Boone, Illinois
Queue IDAH1-047
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity58.6 MW
StateIllinois
CountyBoone
Point of interconnectionMarengo - Belvidere 138 kV
Requested (queue) date2025-03-10
Proposed in-service date2022-09-13
Operational date
Withdrawn date2025-12-03
DeveloperBLUE STONE RENEWABLE XXI LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata