PJM Queue Project AH1-070 — Solar in Ashland, Ohio

PJM Queue Project AH1-070 — Solar in Ashland, Ohio is a 17.0 MW solar interconnection project in Ashland, Ohio with a current status of withdrawn. It is proposed to connect at Jerome - Mohicanville 69 kV.

17.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AH1-070 — Solar in Ashland, Ohio
Queue IDAH1-070
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity17.0 MW
StateOhio
CountyAshland
Point of interconnectionJerome - Mohicanville 69 kV
Requested (queue) date2025-03-04
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-12-01
DeveloperJR ME LLC
Utility / transmission ownerATSI

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.