PJM Queue Project AH1-163 — Solar in an unlisted county, Kentucky

PJM Queue Project AH1-163 — Solar in an unlisted county, Kentucky is a 100.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Millersburg 69 kV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AH1-163 — Solar in an unlisted county, Kentucky
Queue IDAH1-163
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity100.0 MW
StateKentucky
County
Point of interconnectionMillersburg 69 kV
Requested (queue) date2021-09-01
Proposed in-service date2025-07-31
Operational date
Withdrawn date2025-01-28
DeveloperDerby Solar Farm, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata