PJM Queue Project AH1-269 — Battery in Pulaski, Virginia

PJM Queue Project AH1-269 — Battery in Pulaski, Virginia is a 50.0 MW battery interconnection project in Pulaski, Virginia with a current status of active. It is proposed to connect at Claytor 138 kV.

50.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-269 — Battery in Pulaski, Virginia
Queue IDAH1-269
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity50.0 MW
StateVirginia
CountyPulaski
Point of interconnectionClaytor 138 kV
Requested (queue) date2025-02-25
Proposed in-service date2025-12-31
Operational date
Withdrawn date
DeveloperClaytor Energy Storage, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.