PJM Queue Project AH1-354 — Battery in Stephenson, Illinois

PJM Queue Project AH1-354 — Battery in Stephenson, Illinois is a 40.0 MW battery interconnection project in Stephenson, Illinois with a current status of withdrawn. It is proposed to connect at Lena 138 kV.

40.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-354 — Battery in Stephenson, Illinois
Queue IDAH1-354
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity40.0 MW
StateIllinois
CountyStephenson
Point of interconnectionLena 138 kV
Requested (queue) date2021-09-10
Proposed in-service date2024-09-10
Operational date
Withdrawn date2025-07-03
DeveloperBlue Violet Energy, LLC
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.