PJM Queue Project AH1-429 — Solar in Fleming, Kentucky

PJM Queue Project AH1-429 — Solar in Fleming, Kentucky is a 90.0 MW solar interconnection project in Fleming, Kentucky with a current status of withdrawn. It is proposed to connect at Flemingsburg - Spurlock 138 kV.

90.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology

Project facts

Canonical namePJM Queue Project AH1-429 — Solar in Fleming, Kentucky
Queue IDAH1-429
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar
Capacity90.0 MW
StateKentucky
CountyFleming
Point of interconnectionFlemingsburg - Spurlock 138 kV
Requested (queue) date2021-09-10
Proposed in-service date2026-09-01
Operational date
Withdrawn date2025-07-03
DeveloperACE Development Company, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.