PJM Queue Project AH1-482 — Battery in Pulaski, Indiana

PJM Queue Project AH1-482 — Battery in Pulaski, Indiana is a 78.0 MW battery interconnection project in Pulaski, Indiana with a current status of active. It is proposed to connect at Olive - Reynolds #2 345 kV.

78.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-482 — Battery in Pulaski, Indiana
Queue IDAH1-482
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity78.0 MW
StateIndiana
CountyPulaski
Point of interconnectionOlive - Reynolds #2 345 kV
Requested (queue) date2025-02-25
Proposed in-service date2023-09-25
Operational date
Withdrawn date
DeveloperLightsource Renewable Energy Development LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata