PJM Queue Project AH1-538 — Solar+Battery in Van Wert, Ohio

PJM Queue Project AH1-538 — Solar+Battery in Van Wert, Ohio is a 100.0 MW solar+battery interconnection project in Van Wert, Ohio with a current status of withdrawn. It is proposed to connect at East Lima - Haviland 138 kV.

100.0 MWCapacity
WithdrawnStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-538 — Solar+Battery in Van Wert, Ohio
Queue IDAH1-538
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologySolar+Battery
Capacity100.0 MW
StateOhio
CountyVan Wert
Point of interconnectionEast Lima - Haviland 138 kV
Requested (queue) date2021-09-10
Proposed in-service date2025-03-01
Operational date
Withdrawn date2025-07-03
DeveloperRiverlake Energy, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata