PJM Queue Project AH1-541 — Solar+Battery in Dewitt, Illinois

PJM Queue Project AH1-541 — Solar+Battery in Dewitt, Illinois is a 92.4 MW solar+battery interconnection project in Dewitt, Illinois with a current status of active. It is proposed to connect at Chestnut 345 kV.

92.4 MWCapacity
ActiveStatus
PJMMarket
Solar+BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-541 — Solar+Battery in Dewitt, Illinois
Queue IDAH1-541
Statusactive
Source statusactive
MarketPJM
TechnologySolar+Battery
Capacity92.4 MW
StateIllinois
CountyDewitt
Point of interconnectionChestnut 345 kV
Requested (queue) date2025-02-20
Proposed in-service date2025-03-01
Operational date
Withdrawn date
DeveloperGolden West Energy
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata