PJM Queue Project AH1-661 — Other in Muskingum, Ohio
PJM Queue Project AH1-661 — Other in Muskingum, Ohio is a 10.1 MW other interconnection project in Muskingum, Ohio with a current status of active. It is proposed to connect at Cannelville 12.47 kV.
10.1 MWCapacity
ActiveStatus
PJMMarket
OtherTechnology
Project facts
| Canonical name | PJM Queue Project AH1-661 — Other in Muskingum, Ohio |
|---|---|
| Queue ID | AH1-661 |
| Status | active |
| Source status | active |
| Market | PJM |
| Technology | Other |
| Capacity | 10.1 MW |
| State | Ohio |
| County | Muskingum |
| Point of interconnection | Cannelville 12.47 kV |
| Requested (queue) date | 2025-02-18 |
| Proposed in-service date | 2023-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Tallgrass Muskingum Community Power, LLC |
| Utility / transmission owner | AEP |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata