PJM Queue Project AH1-745 — Gas in Vermillion, Indiana

PJM Queue Project AH1-745 — Gas in Vermillion, Indiana is a 770.0 MW gas interconnection project in Vermillion, Indiana with a current status of withdrawn. It is proposed to connect at Eugene-Sullivan 345 kV.

770.0 MWCapacity
WithdrawnStatus
PJMMarket
GasTechnology

Project facts

Canonical namePJM Queue Project AH1-745 — Gas in Vermillion, Indiana
Queue IDAH1-745
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyGas
Capacity770.0 MW
StateIndiana
CountyVermillion
Point of interconnectionEugene-Sullivan 345 kV
Requested (queue) date
Proposed in-service date2031-05-30
Operational date
Withdrawn date2025-05-02
DeveloperTenaska Power Generation, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata