PJM Queue Project AH1-751 — Battery in Green, Kentucky

PJM Queue Project AH1-751 — Battery in Green, Kentucky is a 150.0 MW battery interconnection project in Green, Kentucky with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-751 — Battery in Green, Kentucky
Queue IDAH1-751
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity150.0 MW
StateKentucky
CountyGreen
Point of interconnection
Requested (queue) date
Proposed in-service date2029-09-30
Operational date
Withdrawn date2025-05-02
DeveloperExie Solar, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.