PJM Queue Project AH1-756 — Battery in Mason, Kentucky

PJM Queue Project AH1-756 — Battery in Mason, Kentucky is a 250.0 MW battery interconnection project in Mason, Kentucky with a current status of withdrawn.

250.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-756 — Battery in Mason, Kentucky
Queue IDAH1-756
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity250.0 MW
StateKentucky
CountyMason
Point of interconnection
Requested (queue) date
Proposed in-service date2030-12-31
Operational date
Withdrawn date2025-05-02
DeveloperGoldfinch Solar, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata